Al Halabi Factory compose of three production Halls and an Administration building, utilizing rafter beam with a span 18.5 m, typical module of Rafter and column repeated every 9 meters, with 200 mm height hollow core slab on top of Rafters.
BIM Structural BIM Structural, Precast Concrete
Modern 4 Concrete
Egypt
400